Knowledge Base Articles

Using Layers

Break

Introduction

This topic will provide a basic explanation of what a Layer is, explain the Layer Manager, will show where to find the Layer Manager initially, and provide a link for the topic that shows how to relocate the Layer Manager.

Layers

The Layers are what CAD geometry is created on. The default CAD layer is always visible in the Layers Manager. While the original CAD layer, cannot be deleted, it can be renamed. Any geometry, or dimensions, that are created, are automatically placed on the Active layer.

The Layer Manager

The Layer Manager is located, by default, on the right side of the application. The location of the Layer Manager, however, can be adjusted to preference, as explained in the  Introduction to Docking Panes topic. The purpose of the Layers Manager is to provide a way to keep your CAD drawings organized. Layers can be hidden to only show certain aspects of a drawing, or you can place different versions of the same part on separate layers.  The Layers Manager can be used to specify a particular color and line style to use for each layer, and you can also select all the geometry on a given layer for use with other CAD functions or CAM features.

Example

In this example we have a bunch of entities in the graphics area with only basic layer separation. We do have our points, profile, and solids separated by layer, but with group folders available, we can organize this much better to make any work we're doing a lot easier. In the graphics area, we currently we have:

 

  • Profile
  • Points for:
    • Two different hole sizes
    • One tap size
    • One counterbore size
  • Solids:
    • Fixtures for:
      • First job
      • Second job
    • Stock
    • Workpiece

 

We can use the same logic seen in these bullet points to build our layers and group folders!
Break

Part 1) Creating Groups and Layers

Break

  1. Click the Solid layer to highlight it, then click  Move to New Group.
    Break 
    BreakThis creates the new group and places our Solid layer in it at the same time.
    Break
  2. Now click our new group and click  Move to New Group again to place it in a group as well.
    Break
    Break
  3. Highlight our Points layer and click  Move to New Group.
    Break 
    BreakNow that we have the groups we will need, we add the additional layers our entities will placed on.
    Break
  4. With Group-5 highlighted, click  New Layer.
    Break 
    BreakLayer-6 is created inside Group-5. Notice the new names of the groups and layers are followed by the a number showing the total amount of layers/groups in the Layer Manager.
    Break
  5. Add three more layers to Group-5 to accommodate each hole type to be created for the part.
    Break
    Break
  6. Repeat this process to add three more layers to Group-3.
    Break 
    Break

Part 2) Renaming Groups and Layers

Although we could have been naming groups and layers as we went, once a name is changed, hitting enter automatically makes the next name editable. Because of this, you'll find it's much easier to create the group and layer structure you intend to use first, and then go back to name them all at once.

 

  1. Double-click our Profile layer to make the text editable.
    Break
    Break
  2. Update the name to Profile Cut, and press Enter.
    Break
    BreakThe group name becomes editable.
    Break
  3. Repeat this process to update each item to the following:
    Break
    Break

 

  • Profile Cut
  • Points
    • 0.875 Hole
    • 1/4 20 Tap
    • 0.5 Hole
    • Counterbore
  • Solids:
    • Fixtures
      • Job A
      • Job B
      • Stock
      • Workpiece
        Break

Part 3) Moving Layers Between Groups

You might have noticed in creating our solid layers, all layers were placed inside the Fixtures folder. This was done to demonstrate the way to move layers.

 

  1. Drag and drop the Workpiece layer to the Solids group.
    Break 
    BreakNotice the layer is now outside the Fixtures folder.
    Break
  2. Click the Stock layer to highlight it and click  Move Out.
    Break 
    BreakThe Stock layer is moved out of the Fixtures group and is now located in the Solids group with our Workpiece layer.
    Break
  3. Right-click anywhere in the Layers manager and select Collapse All.
    Break
    BreakAll groups and layers are created, organized, and can easily be collapsed.
    Break
  4. Right-click anywhere in the Layers manager and select Expand All.
    Break
    Break

Part 4) Moving Entities to Layers

Now that we have our layers created, and organized in groups, we can move the entities to the appropriate layers.

 

  1. Click in the Active Layer column of the Job A row to make it the active layer.
    Break 
    Break
  2. Since the Profile Cut geometry is already on the correct layer, click  to hide it.
    Break 
    Break
  3. Hide the Solids group.
    Break
    Break

Tip: Notice the active layer remains visible. Occasionally you will want to have the active layer hidden. To do this, make another layer active, hide the layer you want to be the hidden active layer, and once the layer is hidden, set that to the active layer.

 

  1. Set the Stock layer as the active layer.
    Break
  2. In the graphics area, turn on selection mode and select the geometry shown.
    Break 
    Break
  3. With the Stock layer set to active, select  Modify to Current Layer.
    Break 
    BreakThe stock is placed on the hidden layer and is no longer visible.
    Break
  4. Set the Workpiece layer as the active layer.
    Break
  5. Select the workpiece.
    Break
    Break
  6. With the Workpiece layer set to active, select  Modify to Current Layer.
    Break
    Break
  7. Set Job B layer to active, choose the two further fixtures, and select  Modify to Current Layer.
    Break 
    Break
  8. Hide Job A layer.
    Break
    BreakSince this was the original Solid layer, this is where we were moving all the solids from.
    Break

Part 5) Selection by Color

To make selection of multiple points a little easier, we will use the Pick By Color option in the Home ribbon.
Break

  1. Right-click the 0.875 Hole layer and select Show Only This Layer.
    BreakAll other layers are now hidden.
    Break
  2. Set the 1/4 20 Tap layer to active.
    Break
  3. In the Quick Selection group of the Home ribbon, click  Pick By Layer to see additional options and select  Pick By Color.
    BreakThe Select Colors dialog appears.
    Break
    Break
  4. Select Yellow, and click OK.
    Break
    BreakThe Yellow points are all selected.
    Break
    Break
  5. In the Layers Manager, select  Modify to Current Layer.
    Break
    BreakThe Yellow points for our tapped holes are moved to the hidden 1/4 20 Tap layer.
    Break
    Break
  6. Set the 0.5 Hole as the active layer.
    Break
  7. Select Pick By Color again.
    BreakThe Select Colors dialog appears.
    Break
    Break

Note: Notice the Yellow is no longer an option in this dialog. This dialog, along with the Solid information in the CAD Tree, only shows the currently visible colors. Since we've hidden our yellow tap points, that color does not appear in the dialog.

Break

  1. Select Orange, and click OK.
    Break
    BreakThe Orange points are all selected.
    Break
  2. Select  Modify to Current Layer.
    BreakThe Orange points for our 0.5 Holes are moved.
    Break
  3. Repeat this process to put the Red points on the Counterbore layer.
    Break

Part 6) Adjusting Layer Order

As a final piece of organization, let's put the two hole layers next to each other. We've seen how we can drag layers, and use the Move Out arrow to get layers out of a group. Now, we use the Move Up arrow to adjust the position of a layer.

 

  1. Right-click anywhere in the Layers Manager and select Show All Layers.
    Break
    BreakAll entities become visible again.
    Break
  2. Highlight the 0.5 Hole layer, and click  Move Up.
    Break 
    BreakThe position of the layer is updated to put our two hole layers next to one another.
    Break

This concludes the example.

If you need further assistance, please contact our support team at (727) 489 – 0003 or [email protected]

Leave a comment